![]() Stay up to date with all of the district’s construction happenings by visiting /constructionnews. At SunRidge Middle School, we are fortunate to have the support of our parents and the community. To learn more about San Juan Unified’s pathways across the district’s high schools, visit the CTE program website. The building is anticipated to be completed in January 2023.Ĭheck out some progress photos of construction and renderings of the new space configuration below. ![]() ![]() The new walls are up and construction crews are working on hanging drywall before the next phase begins. “This space just doesn’t work for the program currently, so having the room for a full class to move and work is exciting.”Ĭonstruction began prior to this school year and is well underway, with most of the electrical, plumbing and utilities work already completed. “I am excited about the renovated space as the original area was designed in 1963 for a maximum of 20 students,” said pathway instructor Matt Cole. Horizon Middle School is one of the top performing Title-1 Middle Schools in. Horizon has been a model of excellence in the area of academics, sports, the arts, and parent & community involvement. The manufacturing pathway will receive a reconfiguration of the existing space to house the current woodshop and metal shop, and allow for the addition of an innovation lab. Sunrise Middle School is ranked within the top 50 of all 3,628 schools in Florida (based off of combined math and reading proficiency testing data) for the 2018-19 school year. Horizon Middle School is a traditional public middle school, rich with culture and traditions that have been in place since the school opened in 1995. Rio’s current medical sciences space will be renovated to resemble a hospital, giving students the opportunity to learn essential skills in a real-world setting. San Juan Unified’s CTE programs involve a sequence of courses that integrate core academic knowledge with technical and occupational knowledge, providing students with a pathway to post-secondary education and careers. The current CTE building will receive a 21st century upgrade, allowing students who are currently enrolled in Rio’s medical sciences and manufacturing pathways to learn in a brand-new space. Students enrolled in Rio Americano High School’s Career Technical Education (CTE) classes will soon be able to enjoy a completely renovated learning space. San Juan Adult Education Sunrise Tech Center and Creekside Adult Center Sunrise Park Middle School serves approximately 900 students in grades 6-8.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |